Pengukuran Kapasitas Produksi Kandang Batere untuk Memenuhi Permintaan Konsumen
Abstract
The metal industry is a manufacturing company that produces metals and plastics with its the main product being battery cage. In its production system, the company applies the concept based on orders, where each product will be produced if there is demand from consumers. The study was conducted in the production process of 4 types of products, namely mini battery cage, standard battery cage, floor inserts and cage boundaries. When carrying out the production process, the company experienced obstacles in meeting consumer demand. The first obstacle that occurs is the number of consumer demand so the company is forced to reject several requests that come and the second obstacle is the delay in product completion. This is because the company has not yet determined the available production capacity. Therefore the study was conducted to calculate the capacity available and the capacity needed to produce all types of products. To calculate RCCP (Rought Cut Capacity Planning) the CPOF (Capacity Planning Overall Factor) method is used. Based on the results of these calculations, the results obtained are the capacity needed is much higher than the available capacity. The capacity needed by the company is 43,234.37 hours / month while the available capacity owned by the company is only 6729 hours / month. From the results above, the capacity available at the company is only able to meet 15.56% of the required capacity.
References
Baroto, Teguh, 2002, Perencanaan dan Pengendalian Produksi, Ghalia Indonesia, Jakarta.
Donald W, Fogarty, 1991, Production and Inventory Management, South-Western Publishing Co, United States of America.
Hadiguna, Rika Ampuh, 2009, Manajemen Pabrik-Pendekatan Sistem untuk Efisiensi dan Efektivitas, Bumi Aksara, Jakarta.
Harnatalia, Melly Dwi, 2013, Perencanaan Kapasitas Produksi Bagian Penjahitan Model Baju Koko Ampil 1 di CV. XYZ Surabaya, Jurnal Ilmiah Universitas Surabaya, Vol 2, No.1, pp. 1-20.
Iksan, 2010, Perencanaan dan Pengendalian Produksi dengan Menggunakan Metode Manufacturing Resources Planning di PT. Semen Greseik TBK, Jurnal Tugas Akhir Jurusan Teknik Industri Institut Teknologi Adhi Tama Surabaya, Vol 1, No 1, pp. 47-55.
Kurniasih, Dedeh, Tjutju Tarliah D, Pajar Supian Suri, 2015, Perencanaan Kapasitas Produksi Untuk Box Kemasan Alumunium Foill (Studi Kasus PT. X), Jurnal Tugas Akhir Program Studi Teknik Industri Universitas Pasundan, Vol. 1, No 1, pp. 1-22.
Nasution, Arman dan Prasetyawan, Yudha. 2008, Perencanaan dan Pengendalian Produksi, Edisi 1, Cetakan Pertama, Graha Ilmu, Yogyakarta.
Risal, Wawan K, Puryani, Eko Nursubiyantoro, 2017, Perencanaan Kebutuhan Kapasitas Produksi Pada SP Alumunium, Jurnal OPSI, Vol 10, No 1, pp. 11-18.
Sinulingga, Sukaria, 2009, Perencanaan dan Pengendalian Produksi, Graha Ilmu, Yogyakarta.
Sofyan, Diana Khairani, 2014, Penentuan Jumlah Tenaga Kerja Yang Optimal Pada CV. X, Jurnal Teknovasi, Volume 1, Nomor 1, pp. 44-52.
Copyright (c) 2021 Ayu Bidiawati, Lestari Setiawati, Mutia Pratiwi
This work is licensed under a Creative Commons Attribution 4.0 International License.
Copyright in each article belongs to the author.
- The author acknowledges that the Journal Teknos (Technology and Science Journal) as a publisher who publishes for the first time with the Creative Commons Attribution 4.0 International License.
- The author can enter the writing separately, manage the non-exclusive distribution of manuscripts that have been published in this journal into other versions (eg sent to the repository of the author's institution, publication in books, etc.), by acknowledging that the manuscript was first published in the Journal Teknos (Technology and Science Journal)